- Back to Street bins
- Home
- Product catalog
- Complementary systems
- Street bins
- Green Point 360 Vetroplast
Green Point 360 eco-island
Vetroplast · Green Point
Green Point 360 Vetroplast
Green Point 360 is Vetroplast’s modular 360° eco-island concept: above-ground separate collection with a layout designed for users, maintenance and urban integration.
- Line
- Vetroplast · Green Point 360
- Concept
- Modular eco-island
- Use
- Above-ground separate collection
- Brand
- Vetroplast · OMAS Group
Performance and benefits
Layout
Modular
modular island with dedicated stream accessvs scattered containers in the square
360° Green Point eco-island.
- Multiple streams on one site
- Dedicated access to reduce sorting errors
- Neighbourhood eco-points and car parks
Decorum
Coordinated
Vetroplast styling across the whole sitevs islands without coordinated finishes
Vetroplast finishes on the project.
- Fits tourist areas and seafronts
- Clear signage for users
- Combinable with Evolution, Euro, Genesi and Bell-e
Project
Specified
single project and Bunder Waste configurationvs multiple suppliers at one point
Dimensioning with Bunder Waste.
- Accessories and layout for local service
- Multi-stream collection with uniform look
- Bunder Company SRL commercial support
Description
- ConceptModular eco-island for multiple streams on one site.
- UsersOrganised deposits and clear signage to reduce sorting errors.
- StreetscapeVetroplast finishes aligned with the project.
- ProjectSizing and accessories defined in tender with Bunder Waste.
- RangeCan combine with Evolution, Euro, Genesi and Bell-e units.
- DistributionBunder Company SRL for Italy.
Island design
- For accessibility, collection vehicles and tender criteria see also designing an eco-island (also relevant for above-ground layouts).
Applications and contexts

Punti ecologici di quartiere

Aree pubbliche e parcheggi

Contesti turistici e lungomari
For project context and on-site requirements, see the guide Underground bins for condominiums and residential complexes: when do they pay off? and the solution page Neighbourhood eco-islands built into urban space.
Frequently asked questions
Cosa include Green Point 360?
È una soluzione Vetroplast per isole ecologiche modulari: configurazione contenitori, finiture e accessori dipende dal capitolato. Scrivi a info@bunder.it con planimetria e frazioni richieste.
È compatibile con contenitori Bell-e o Evolution?
Green Point può essere progettato in continuità con le gamme metalliche Vetroplast distribuite da Bunder Waste. Il team commerciale definisce l’abbinamento ottimale.
How can I get the technical datasheet or brochure?
Up-to-date datasheets, brochures and design data are not available for download on this site. Contact Bunder Company via the contact page or email info@bunder.it; the Bunder Waste team will send the documentation for this product and your specification.
Recommended products
More solutions in the Street bins range and related families.

Vetroplast · Genesi
Genesi 1100
Vetroplast Genesi 1100 is a 1,100-litre hot-dip galvanised steel wheeled bin: self-supporting welded body, tapered form with rounded edges and RAL colours for…
View product
Vetroplast · Evolution
Evolution 2000
Vetroplast Evolution 2000 is a 2,000-litre above-ground bin for urban collection: mid-size capacity, streetscape integration and durable steel construction.
View product
Vetroplast · Euro
Euro 3200
Vetroplast Euro 3200 is a 3,200-litre above-ground container for separate collection: configured openings per stream and finishes for high-traffic public sites.
View product
Recommended articles
Linked guides and articles: operational context, design choices and useful references.
ArticleLuca di LeoneUnderground bins for condominiums and residential complexes: when do they pay off?
Condominiums and residences: footprint, access, fraction management and operating costs before choosing an underground system.
Read article
ArticleLuca di LeoneHow to design an underground eco-island: space, capacity, vehicles and civil works
Designing an underground eco-island: volumes, fractions, layout, traffic, collection vehicles, civil works and emptying systems to define before procurement.
Read article
ArticleLuca di LeoneHow to prepare a technical specification for an underground eco-island
What to include in a tender spec for an underground island: performance, civil works, vehicles, maintenance, safety and acceptance criteria.
Read article
